06Icon of the Seas2021–22 · Meyer Turku365 m · 248 663 GT
05Carnival Celebration2021 · Meyer Turku344 m · 183 521 GT
04Costa Toscana2020–21 · Meyer Turku337 m · ≈185 000 GT
03Mardi Gras2019 · Meyer Turku344 m · 181 808 GT
02Costa Smeralda2019 · Meyer Turku337 m · 185 010 GT
01AIDAnova2018 · Meyer Werft, Papenburg337 m · 183 858 GT
What we do
Shipyards & buildings
Welding, pipefitting and installation crews for shipyards and building sites in Finland, Estonia and Germany.
Fig. 02 — Pipe module, workshop
Fig. 02 — Pipe module, workshop
A — ShipyardsMeyer Turku · Rauma · Wismar · Papenburg
Fig. 02A — Cruise ship blocks in the flooded dock
Welding & steel structures
Welding and installation of steel structures on board and in the workshop.
Shipyard
Pipe welding & pipefitting
Welding and installation of pipelines and pipe modules on board.
Shipyard
Cooling & heating
Installation of cooling and heating systems.
Shipyard · Building
Electrical installation
Electrical installation work on ships.
Shipyard
Interior works
Interior outfitting on board.
Shipyard
B — Buildings & plantsEstonia · Finland
Fig. 02B — Boiler room with pipework and pumps
Water supply & sewage
Installation of water supply and sewage systems.
Building
Boilers & boiler rooms
Installation of boilers and boiler rooms.
Building
Insulation
Insulation works on pipework and equipment.
Shipyard · Building
From the yard
Our crews at work
Fig. 04 — On site · 2018–2026
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.11 — Stern blocks with thruster tunnels in the dock11 / 11
Fig. 04.01 — Shipyard with gantry crane seen from the water01 / 11
Fig. 04.02 — Cruise ship at the outfitting quay02 / 11
Fig. 04.03 — Hull block lifted by crane03 / 11
Fig. 04.04 — Pipe module with welded pipework in the hall04 / 11
Fig. 04.05 — Machinery module under snow before lifting05 / 11
Fig. 04.06 — Icon-class cruise ship in the building dock06 / 11
Fig. 04.07 — Superstructure blocks in the dock07 / 11
Fig. 04.08 — Hull side at the quay with a worker08 / 11
Fig. 04.09 — Sunset over the upper deck under construction09 / 11
Fig. 04.10 — Deck block lifted into place10 / 11
2009Founded in Tallinn
50+Certified specialists
10Cruise ships since 2018
3Countries — EE · FI · DE
Crew & reach
On site across the Baltic
We work at shipyards in Finland and Germany and on building sites across Estonia.
TallinnHead office · Osaühing WELDCOM
FinlandWeldcom Group Oy · Raisio · est. 2023
TurkuMeyer Turku · 178 km
RaumaRauma shipyard · 259 km
WismarWismar shipyard · Germany · 1016 km
PapenburgMeyer Werft · Germany · 1277 km
Fig. 03 — Distances from Tallinn, great-circle
Construction · Estonia
Projects in Estonia
2022Teatrimaja
2021Skyon/, Saku Õlletehas/, Ülemiste City
2020TTÜ/, Tromsbas/, Tallinna Tondi Kool
2019Baltic Queen/, Ülemiste keskus/, Sadamarket
2018Mobec/, IT-Agentuur/, Tondiraba Jäähall
Worked with
Meyer TurkuOy
Tehnobitt ShipyardOy
BLRT RekatoOÜ
Caverion EestiAS
AbertsonOÜ
Osilia JahutusOÜ
AcRefOÜ
Documents
Certificates & registration
Our welders hold international qualification certificates. Weldcom Group Oy holds the certificates, permits and insurance required for work in Finland.
Welding quality
EN ISO 3834
Quality requirements for fusion welding of metallic materials.
Certificate on requestWelders
EN ISO 9606-1
Qualification testing of welders — fusion welding of steels.
Certificates on requestFinland
Weldcom Group Oy
Listed in the Trade, Prepayment and Employer registers; VAT-registered.